N\n Company name Year Name of works
1 LLC ” Sandora “ 2017 Turnkey welding and installation works under the project “Organization of protective fencing”
2 PJSC “WIMM-BILL-DUNN”, Vishnevoe 2017 Turnkey welding, installation and electrical installation work under the project: ” Agusha viscous yoghurt production line ” . PIG system integration
3 PJSC “WIMM-BILL-DUNN”, Vishnevoe 2017 Turnkey welding, installation and electrical installation works under the project: ” Expansion of the self-supporting insulated wire of the curd department station “
4 PJSC “WIMM-BILL-DUNN”, Vishnevoe 2017 Turnkey welding, installation and electrical installation work under the project: ” Separator curd production department “
5 Volynholding CJSC 2018 Installation of production equipment and pipelines for the production and packaging of white sauces and marinades in the production workshop No. 4
6 PJSC “Sun Inbev Ukraine 2018 Dismantling of the old one, followed by packaging for transportation and installation of a new labeling machine supplied by Krones AG
7 PJSC “WIMM-BILL-DUNN” Vishnevoe / g. Kharkov 2018 Turnkey welding , dismantling and electrical installation works under the project: ” Expansion of the separator curd production department “
8 PJSC “WIMM-BILL-DUNN”, Vishnevoe 2018 The complex robots through the isolation and isolation of the “Led Voda” pipeline with sterile water
9 PJSC “WIMM-BILL-DUNN”, Vishnevoe 2018 Modernization of the line on virobnistvu vuzky yoghurt Agusha

Modernization of the CIP station of the dietary area No. 2

10 PAT “Tulchinka”     2019 For connection and strapping of a single-circuit CIP station module, connection of a pasteurization module, production of a manual panel for three milk tanks.
11 FE “Coca-Cola Beverages Ukraine Limited” 2019 “Complex of works on re-commutation of the labeling machine”
12 PAT “Yagotynskoe for Children” 2019 Turnkey welding, installation and electrical work in 2 stages according to the project: ” Expansion of the mixing section “
13 PAT “Yagotynskoe for Children” 2019 Turnkey welding, installation and electrical work under the project: ” Integration of self-supporting insulated wire of ALCIP station “
14 TOV “TEKHNOKOM” (TM “MIVINA”), Kharkiv 2020 Welding, installation and electrical installation works on projects: “Oil Room” and “Section for storage and distribution of sunflower oil”
15 Conti plant, Kanev 2020 Complex of works on unloading and moving of technological equipment
16 Prat “Danone Cremez”, Kremenchug  2020 Replacing the main bearing on the filling unit
17 LLC “Danone Dnipro”, Kherson, 2020 Turnkey welding, installation and electrical installation work under the project: “Optimization of mixed phases”
18 PAT “Yagotynskoe for Children” 2020 Welding, installation and electrical installation works on projects: ” Ultra-pasteurization installation”
19 PAT “Yagotynskoe for Children” 2020 Welding, installation and electrical work on projects: ” Organization of the fermentation site”
20 Yagotynsky creamery 2020 Turnkey welding, installation and electrical installation work under the project: ” Curd-de c ertny shop “